top of page
Search

[KEY] DMAIC (Six Sigma) Project Matrix Data Sheet

structured matrix data sheet for DMAIC (Six Sigma) projects, tailored for automotive/manufacturing quality improvement. It includes key phases, deliverables, tools, and metrics:

DMAIC (Six Sigma) Project Matrix Data Sheet

Project Title: [E.g., "Reducing Car Hood Paint Defects"]Team: [Cross-functional members]Date: [Timeline]

DMAIC Phase

Key Deliverables

Tools & Techniques

Data Metrics

Output Examples

Define (D)

- Project charter (SIPOC, VOC).


- Stakeholder alignment.

- Voice of Customer (VOC).


- SIPOC diagram.

- Baseline defect rate (e.g., 12% paint flaws).


- Cost of poor quality (COPQ).

Goal: Reduce defects by 50% in 6 months.

Measure (M)

- Data collection plan.


- Process maps.

- Check sheets.


- MSA (Gage R&R).


- Process capability (Cp/Cpk).

- Defect types/rates (Pareto chart).


- Cycle time data.

Finding: 80% defects from primer contamination (MSA confirmed gauge accuracy).

Analyze (A)

- Root cause verification.


- Statistical validation.

- 5 Whys.


- Fishbone diagram.


- Hypothesis testing (t-test, ANOVA).

- Correlation analysis.


- RPN (if FMEA used).

Root Cause: Poor supplier primer storage (p<0.05 in ANOVA).

Improve (I)

- Pilot solutions.


- DOE (Design of Experiments).

- Poka-yoke.


- FMEA updates.


- Simulation software.

- Pilot results (e.g., defect reduction to 4%).


- Cost-benefit analysis.

Solution: New primer drying protocol + supplier audit.

Control (C)

- Standardized SOPs.


- Control plan.

- SPC charts.


- Control plans.


- Training docs.

- Sustained defect rate (e.g., 3% ±0.5%).


- CpK >1.33.

Sustained Result: Saved $180K/year, 6σ compliance.

Automotive-Specific Additions

  1. IATF 16949 Alignment:

    • Control Plan: Maps inspection points to critical characteristics (e.g., hood thickness).

    • PPAP: Documents DMAIC changes for customer approval.

  2. Critical Tools:

    • MSA: Ensures measurement accuracy for defects (e.g., paint thickness gauges).

    • DOE: Optimizes parameters (e.g., oven temp, spray pressure).

  3. Metrics:

    • DPMO (Defects Per Million Opportunities).

    • FTY (First-Time Yield) for stamping/welding processes.

Example Data Inputs & Outputs

Phase

Input Data

Analysis Output

Measure

500 hoods inspected, 60 defects.

Pareto shows 70% defects from dust particles.

Analyze

Primer viscosity lab tests.

Low viscosity correlates with defects (R²=0.89).

Improve

Pilot batch with new primer.

Defects dropped to 8/500 (84% improvement).

Templates & Software

  • Project Charter Template: [Link]

  • SPC Chart (X-bar R): [Example]

  • Software: Minitab (statistics), JMP (DOE), Power BI (dashboards).

Key Takeaways

  • Data-Driven: Relies on statistical validation (e.g., p-values, CpK).

  • Structured: Phases ensure thorough RCA and sustainable fixes.

  • ROI Focused: Tracks cost savings (e.g., reduced scrap/rework).

Need a completed DMAIC example (e.g., Excel/PDF) or industry-specific KPIs

 
 
 

Recent Posts

See All
[CSI] Analysis

#6.1.2 Opportunities can lead to the adoption of new practices, launching new products, opening new markets, addressing new clients,...

 
 
 
[TECH] Automotive 2025

Trends The Software-Defined Vehicle:  The biggest shift is that cars are no longer just hardware. Functions delivered via OTA updates...

 
 
 

Comments


Verification Certificate

Please key information An ISO verification certificate, report , code number  commonly known as an ISO certification or other certificate, is an official document that verifies that an organization’s management system, product etc.

Contact us

Certificate number / If you have questions, please let us know

IR Gry (No Back Groud)_edited.jpg

I T E P  Register

USA.

Overseas

Line ITEP_edited.jpg

© 2025 by Last Chance. Powered and secured by itep

© All Rights Reserved, ITEP Register (ITEP)
bottom of page