[KEN 5] Job Audit Checklist for CQI
- Kriss Nakhon
- Jul 2, 2025
- 2 min read
Job Audit Checklist for CQI-11 Plating System Assessment (3rd Edition)
This job audit checklist ensures compliance with AIAG's CQI-11 (3rd Edition) requirements for plating processes. It covers key areas such as process control, materials, equipment, and personnel competency.
1. General Information
Audit Date: _______________
Auditor(s): _______________
Plating Process Assessed: (e.g., Zinc, Nickel, Chrome, etc.) _______________
Work Shift: _______________
Audit Scope: (e.g., Pretreatment, Plating, Post-Treatment, Racking, Waste Treatment)
2. Process Control & Work Instructions (Paragraph 3)
✅ Are documented work instructions available at the plating line?
✅ Are critical process parameters (time, temperature, current density, pH) monitored and recorded?
✅ Are corrective actions taken when out-of-spec conditions occur?
✅ Is there a process change control system in place?
✅ Are process capability studies (Cp/Cpk) conducted and reviewed?
Findings & Observations:
3. Materials Management (Paragraph 4)
✅ Are all chemicals and plating materials from approved suppliers?
✅ Are COAs (Certificates of Analysis) available for incoming chemicals?
✅ Are chemical concentrations verified before use?
✅ Are plating baths tested and adjusted per control plans?
✅ Are hazardous materials stored and labeled properly?
Findings & Observations:
4. Equipment & Maintenance (Paragraph 5)
✅ Is equipment (tanks, rectifiers, filters) maintained per schedule?
✅ Are calibration records available for critical instruments (thermometers, pH meters, amp meters)?
✅ Are rectifiers and anodes inspected for wear/damage?
✅ Are preventive maintenance logs up to date?
Findings & Observations:
5. Personnel Training & Competency (Paragraph 6)
✅ Are operators trained on plating processes and safety?
✅ Is there a certification process for critical plating jobs?
✅ Are training records maintained and up to date?
✅ Do operators understand emergency procedures (chemical spills, tank leaks)?
Findings & Observations:
6. Nonconforming Product & Corrective Actions (Paragraph 7)
✅ Is there a clear process for identifying and segregating nonconforming parts?
✅ Are root cause analyses (5Why, 8D) performed for defects?
✅ Are corrective actions verified for effectiveness?
Findings & Observations:
7. Environmental & Safety Compliance (Paragraph 8)
✅ Are waste treatment procedures followed (e.g., neutralization, sludge disposal)?
✅ Are SDS sheets accessible for all chemicals?
✅ Are PPE (gloves, goggles, aprons) available and used?
✅ Are emergency eyewash/showers functional and inspected?
Findings & Observations:
8. Audit Rating (Per CQI-11 Scoring)
Category | Score (1-5) | Remarks |
Process Control | ⬜1 ⬜3 ⬜5 | __________ |
Materials | ⬜1 ⬜3 ⬜5 | __________ |
Equipment | ⬜1 ⬜3 ⬜5 | __________ |
Personnel | ⬜1 ⬜3 ⬜5 | __________ |
Corrective Actions | ⬜1 ⬜3 ⬜5 | __________ |
Safety/Environmental | ⬜1 ⬜3 ⬜5 | __________ |
Overall Compliance: ⬜ Fully Meets ⬜ Partially Meets ⬜ Does Not Meet
9. Corrective Actions & Follow-Up
Nonconformity | Action Required | Responsible Person | Due Date |
________________ | ________________ | ________________ | ________ |
________________ | ________________ | ________________ | ________ |
Auditor Signature: _______________ Date: ________Facility Representative: _______________ Date: ________
Notes:
Fully Meets (5): No major findings, fully compliant.
Partially Meets (3): Minor gaps needing correction.
Does Not Meet (1): Major nonconformities requiring immediate action.
This checklist ensures a structured job audit for plating processes per CQI-11 3rd Edition. Adjust as needed for specific customer or regulatory requirements.
More... a version in Excel/PDF for easier tracking....
_edited.jpg)
Comments