CQI abbreviations lists
- Kriss Nakhon
- Jul 1, 2025
- 2 min read
📜 Automotive CQI Abbreviations List
1.AIAG Standards (CQI-9, CQI-11, etc.) are available at AIAG.org/store.
2.IATF 16949 clauses reference CQI compliance (e.g., Clause 8.5.1.1 for special processes).
3.OEM-Specific Terms (e.g., Ford Q1, GM BIQS) are defined in their supplier manuals.
Abbreviation | Full Form | Description | Source |
AIAG | Automotive Industry Action Group | Develops CQI standards (e.g., CQI-9, CQI-11) | |
CQI | Continuous Quality Improvement | Process improvement framework for automotive suppliers | AIAG |
IATF | International Automotive Task Force | Governs IATF 16949 (Auto QMS Standard) | |
VDA | Verband der Automobilindustrie | German automotive standards (e.g., VDA 6.3) | |
PPAP | Production Part Approval Process | OEM-required part validation (18 documents) | AIAG PPAP Manual |
FMEA | Failure Mode & Effects Analysis | Risk assessment tool (DFMEA/PFMEA) | AIAG & VDA FMEA Handbook |
TUS | Temperature Uniformity Survey | CQI-9 requirement for furnace validation | AMS 2750 (SAE Aerospace) |
SAT | System Accuracy Test | CQI-9 thermocouple calibration check | AMS 2750 |
AMS | Aerospace Material Specification | Heat treat standards (e.g., AMS 2750) | SAE International |
Nadcap | National Aerospace and Defense Contractors Accreditation Program | Audits special processes (e.g., heat treat) | |
BIQS | Built-In Quality Supply Base | GM’s supplier quality program | |
MMOG/LE | Materials Management Operations Guideline/Logistics Evaluation | Ford/GM logistics compliance tool | |
IPC | Institute of Printed Circuits | Soldering standards (e.g., IPC-A-610) | |
AWS | American Welding Society | Certifications for CQI-15 (Welding) | |
RJG | Robert James Group | Scientific molding training (CQI-23) | |
TQM | Total Quality Management | Toyota’s quality philosophy (via CQI-21) | Toyota Production System |
OEM | Original Equipment Manufacturer | Auto brands (e.g., Ford, Toyota, VW) | N/A |
Tier 1 | Direct Supplier to OEM | Must comply with full CQI standards | IATF 16949 |
Tier 2 | Sub-Supplier to Tier 1 | Focus on process-specific CQIs | Customer-Specific Requirements (CSR) |
PFMEA | Process FMEA | Required for IATF 16949 & CQI-19 | AIAG/VDA FMEA Manual |
SPC | Statistical Process Control | Monitoring production stability | AIAG SPC Manual |
DOE | Design of Experiments | Used in CQI-23 (Molding) optimization | SAE J2886 |
AOI | Automated Optical Inspection | CQI-17 soldering validation | IPC-A-610 |
ESD | Electrostatic Discharge | Critical for CQI-17 (Electronics) | ANSI/ESD S20.20 |
REACH | Registration, Evaluation, Authorization of Chemicals | CQI-11 plating compliance | |
EPA | Environmental Protection Agency | CQI-11 wastewater regulations |
_edited.jpg)
Comments